Proposed Additions and Alterations involving an additional 2nd storey to the existing JTC Standard Factory MK 7, Yan San Metals

This is an A&A (Additions and Alterations) project adding a second storey to an existing JTC Standard Factory located in the Tuas industrial area. The work is being executed by TGW Construction Pte Ltd, in collaboration with registered engineers and consultants. It has proper approval and is monitored under relevant Singapore regulatory agencies (MOM, NEA, BCA).
The scope involves adding a new 2nd storey to an already existing factory structure. Such projects are common in industrial estates when the owner wants to increase usable floor space without reconstructing the whole building.
-
Site setup and safety barrier installation
-
Scaffolding and working platform for work-at-height
-
Demolition or hacking of part of the roof for vertical extension
-
Civil works for column extension, slab casting, or steel structure
-
Bricklaying or lightweight partition wall erection
-
Roofing and ceiling works
-
Internal tiling, painting, and finishing
-
Installation of steel staircase (if required)
-
Overall site management and coordination
-
Waste disposal and site cleanliness throughout project